| Contract Number | Vendor Name | Type of Contract | Reason for Change | Original Term Date | Revised Term Date (if applicable) | Original Contract Amount | Revised Contract Amount (if applicable) | Division |
|---|---|---|---|---|---|---|---|---|
| 65451 | ALL STAR FORD INC - DBA ALL STAR FORD -PALESTINE | Purchase Order | Internal Repair - Initial Purchase Order (PO) amount of $250.00 to diagnose loss of engine coolant and loss of power on 2018 Chevy Silverado 1500 4X4, Property #212042, at Middle Trinity Ecosystem Project. Vendor replaced the water pump, antifreeze, and 3 serpentine belts and added distilled water. Additional costs were $242.00 for labor and $416.36 for parts. | 04/24/2026 | N/A | $250.00 | $908.36 | WL |
| 64932 | MINER LTD DBA OVERHEAD DOOR COMPANY OF HOUSTON | Purchase Order | Internal Repair - Initial PO amount of $342.00 for service call to come look at boat barn doors at Annex Property in Rockport, Property #195843. Doors were damaged and were not opening and closing correctly. Vendor replaced bottom panels on 4 doors and cables on 1 door. Additional costs were $3,153.00 for labor. | 04/10/2026 | N/A | $342.00 | $3,495.00 | CF |
| 64324 | FAIRWAY AUTO CENTER LP | Purchase Order | Internal Repair – Initial PO amount of $500.00 for 2015 JEEP Patriot, Property #205947, at Tyler Nature Center, to find source of noise. Vendor found A/C compressor was bad and needed to be replaced. Additional costs were $746.00 for labor and $1,269.33 for parts. | 02/25/2026 | 03/06/2026 | $500.00 | $2,515.33 | WL |
| 60757 | TYLER OVERHEAD DOOR CO INC | Purchase Order | Initial PO amount of $7,705.00 for purchase/installation of powered gate unit and receiver in the Maintenance Department at Tyler Nature Center Regional Complex. Manufacturer backorders and in-house power issues caused delay in installation. Additional costs were $267.00 for parts. | 12/25/2025 | 05/15/2026 | $7,705.00 | $7,972.00 | WL |
| 60606 | ROBSTOWN HARDWARE COMPANY DBA KING RANCH AG & TURF | Purchase Order | Internal Repair - Initial PO amount of $290.00 to diagnose starter issue to John Deere Tractor, Property #181802, at Huntsville State Park. The vendor repaired the clutch, leaks, filters, and seat loader. Additional costs include $4,240.14 for labor and $1,913.37 for parts. | 12/10/2025 | 02/23/2026 | $290.00 | $6,443.51 | SP |
| 68429 | TYLER OVERHEAD DOOR CO INC | Purchase Order | Internal Repair - Initial PO amount of $500.00 to diagnose and repair power issues with the north and south gates at Tyler Nature Center Regional Complex. Vendor replaced circuit boards on each gate. Additional costs were $770.00 for labor. | 08/15/2026 | N/A | $500.00 | $1,270.00 | WL |
| 67344 | RUDD PLUMBING | Purchase Order | Internal Repair- Initial PO amount of $500.00 to diagnose and repair water leak at the Wildlife Bunkhouse, Property #596245, at Tyler Nature Center Regional Complex. Additional costs were $5,821.85 for labor and $5,000.00 for parts. | 08/01/2026 | N/A | $500.00 | $11,321.85 | WL |
| 63910 | BKM MOTOR SALES INC DBA MADISONVILLE KAWASAKI | Purchase Order | Internal Repair - Initial PO amount of $250.00 to diagnose the equipment starting issues on the ORV Kawasaki Mule ProFXT, Property #207084, in College Station. The vendor replaced the wiring harness due to rat damage. Additional costs were $830.00 for labor and $1,349.89 for parts. | 02/13/2026 | 07/31/2026 | $250.00 | $2,429.89 | WL |
| 64933 | LAKE COUNTRY CHEVROLET INC | Purchase Order | Internal Repair - Initial PO amount of $150.00 to address A/C issue in Chevrolet Silverado 1500, Property #216866, at Martin Dies Jr. State Park. The vendor supplied refrigerant and performed a leak test. Additional costs were $95.35 for parts. | 04/30/2026 | N/A | $150.00 | $245.35 | SP |
| 65033 | DEJEAN AUTOMOTIVE INC | Purchase Order | Internal Repair - Initial PO amount of $165.00 to diagnose engine light issue on Ford F-250 truck, Property #205916, at Sea Rim State Park. The vendor removed, replaced, and reprogrammed the reductant heater. Additional costs were $495.00 for labor and $588.24 for parts. | 04/17/2026 | 05/03/2026 | $165.00 | $1,248.24 | SP |
| 63969 | AZTEC RENTAL CENTER NO 1 INC | Purchase Order | Internal Repair - Initial PO amount of $130.00 to diagnose start issue to Grasshopper3, Property #181200, at Stephen F. Austin State Park. The vendor replaced and repaired alternator, solenoid fuel valve, seat cushion switch, battery, idler, deck belt, clutch, and deck lift. Additional costs were $1,105.00 for labor and $1,876.08 for parts. | 04/09/2026 | 05/31/2026 | $130.00 | $3,111.08 | SP |
| 66532 | BILL FICK FORD | Purchase Order | Internal Repair - Initial PO amount of $175.00 to diagnose sensor issue to Ford F-350 Van, Property #205928, at Lake Livingston State Park. The vendor removed and replaced both diesel exhaust fluid injectors and tank sender. Additional costs include $700.00 for labor and $936.25 for parts. | 05/31/2026 | 06/30/2026 | $175.00 | $1,811.25 | SP |
| 69033 | LOWE TRACTOR & EQUIPMENT INC | Purchase Order | Internal Repair-Initial PO amount of $500.00 to diagnose and repair Kubota tractor, Property #206815, at Tyler Nature Center Regional Complex. Additional costs were $2,247.42 for labor, and $2,038.15 for parts. | 08/14/2026 | N/A | $500.00 | $4,785.57 | WL |
| 69285 | MARK COFFEY | Purchase Order | Internal Repair - Initial PO amount of $500.00 to diagnose issue with 2012 Ford F-550 truck, Property #189860, at Middle Trinity Ecosystem Project, having a loss of power. Vendor replaced the engine long block, turbo, harmonic balancer, exhaust manifold, up pipe, motor oil, antifreeze, oil filter, air filter, fuel filter, oil separator and injectors, and repaired wiring. Additional costs were $5,110.00 for labor and $20,514.67 for parts. | 08/28/2026 | N/A | $500.00 | $26,124.67 | WL |
| 70114 | PALESTINE FUEL INJECTION SERVICE INC | Purchase Order | Internal Repair – Initial PO amount of $500.00 to diagnose diesel exhaust fluid (DEF) system codes on 2019 John Deere 333G Skid Steer, Property #217560, at Middle Trinity Ecosystem Project. Vendor replaced engine parts related to DEF system. Additional costs were $1,455.00 for labor and $1,545.00 for parts. | 08/31/2026 | N/A | $500.00 | $3,500.00 | WL |
| 64789 | EWALD II LLC DBA EWALD KUBOTA | Purchase Order | Internal Repair - Initial PO amount of $175.00 to diagnose malfunctioning A/C system in Kubota tractor, Property #209324, at Brazos Bend State Park. Vendor removed and replaced A/C belts then cleaned and serviced the inner and outer cabin filters, primary and secondary fuel filters, inner and outer engine air filters, cooling pack, and other A/C system filters. Additional costs were $714.00 for labor and $157.32 for parts. | 04/30/2026 | 05/31/2026 | $175.00 | $1,046.32 | SP |
Internal Repair Purchases
An internal repair is a repair to state-owned equipment that cannot be reasonably defined prior to the actual repair and the extent of the repair needed cannot be determined until the equipment is disassembled. Internal repairs are usually the result of an unexpected, basic service outage. For example, the unexpected failure of a building’s air conditioner may result in unanticipated repair to electrical circuitry, which would constitute an internal repair. Internal repairs must include labor and may include parts.
Competitive award is not required for an internal repair. However, internal repairs are reported on the Electronic State Business Daily (ESBD), LBB website, and other transparency reports as required by state purchasing policies and procedures.
Internal Repair Procedures:
To limit agency liability, the following statement is added to the Purchase Order as a note to the supplier:
“Not to exceed {insert reasonable dollar limit} for repair services unless prior authorization is provided by the agency.”
After the equipment is taken apart and the issue identified, the vendor provides a quote to TPWD for review and approval. If approved, the purchaser issues a contract amendment to formally approve the additional services and cost.
Emergency Purchases
Emergencies occur as the result of unforeseeable circumstances and may require an immediate response to avert an actual or potential public threat. If a situation arises in which compliance with normal procurement practices is impractical or contrary to the public interest, an emergency purchase may be warranted to prevent a hazard to life, health, safety, welfare, property or to avoid undue additional cost to the state.
Emergency Contract Awards are reported on the ESBD, LBB website, and other transparency reports as required by state purchasing policies and procedures.
In official recognition of the adoption of this resolution in a lawfully called public meeting of the Texas Parks and Wildlife Commission, we hereby affix our signatures this 5th day of November, 2026.
Paul L. Foster, Chairman
Oliver J. Bell, Vice-Chairman
Wm. Leslie Doggett, Member
Anna B. Galo, Member
Dr. John A. McCall, Jr., Member
Robert L. “Bobby” Patton, Jr., Member
Travis B. “Blake” Rowling, Member
Dick Scott, Member
Timothy “Tim” Timmerman, Member