Material contract changes for commission review — November 7, 2024
Contract Number Vendor Name Type of Contract Reason for Change Original Term Date Revised Term Date (if applicable) Original Contract Amount Revised Contract Amount (if applicable) Division
42970 Mackie’s Automotive, Inc. Purchase Order Internal Repair – Initial a (PO) amount of $100.00 to diagnose issues with 2013 Ford Crew Cab Truck, Property #203018, Caprock Canyon State Park. Relay kit replacement was required. Additional costs were $130.98 for labor and $54.72 for parts. 6/26/2024 7/1/2024 $100.00 $285.70 SP
43226 Heart of Texas Purchase Order Internal Repair – Initial PO amount of $600.00 to diagnose issue with HVAC System at Beach Lodge, Property #895164, Lake Brownwood State Park. The vendor replaced the condenser coil and added freon. Additional costs were $214.71 for parts. 7/5/2024 7/9/2024 $600.00 $814.71 SP
CA-3259 Phoenix Diversified, LLC Contract Initial contract amount of $100,000.00 for right-of-way clearing service contract for Gus Engeling Wildlife Management Area (WMA). Project added for clearing area for bunkhouse construction in accordance with Contract, Section 11 – Additional Services. With contract renewal, exercised total contract value now includes the cost of the additional project ($20,600.00) and contract renewal term amount ($100,000.00). 8/31/2024 8/31/2025 $100,000.00 $220,600.00 WL
41944 Don’s Heating and Air Purchase Order Internal Repair – Initial PO amount of $100.00 to diagnose issue with HVAC unit at Discovery Center, Property #148146, Caprock Canyon State Park. The vendor replaced the heat pump. Additional costs were $7,800.00 for labor and parts. 5/24/2024 6/11/2024 $100.00 $7,900.00 SP
42667 CB Electric Purchase Order Internal Repair – Initial PO amount of $100.00 to diagnose electrical issues at the Park Peace Officer (PPO) residence, Property #999486, Palo Duro Canyon State Park. Damage to underground conduit was discovered caused by auger used to drill hole for fence post. A 120 ft. ditch was required to be uncovered, and conduit/wiring replaced. Additional costs were $7,250.00 for parts and labor. 6/18/2024 7/16/2024 $100.00 $7,350.00 SP
CA-5962 Triumph Cabling Systems, LLC Contract Initial contract amount of $484,577.95. Change orders to contract were required as follows: Change order 1 in the amount of $41,327.28 to add additional fiber installation for future PPO building site at Falcon State Park. Change order 2 in the amount of $27,500.00 due to new underground fiber installation route. 12/31/2023 8/31/2024 $484,577.95 $553,405.23 SP
42116 Smart’s Truck & Trailer Equipment Purchase Order Internal Repair – Initial PO amount of $200.00 to diagnose issues with brakes, reflectors, and wiring on gooseneck trailer, Property #180806, JD Murphree WMA. Vendor determined all wiring, lights, reflectors, and brakes/actuator required replacement. Additional costs were $2,425.00 for labor and $6,001.82 for parts. 5/30/20204 8/16/2024 $200.00 $8,626.82 WL
41845 Prickly Pear Contracting LLC Purchase Order Internal Repair – Initial PO amount of $100.00 to diagnose issue with electrical gate at park entrance gate at Palo Duro Canyon State Park. Vendor reset gate on tracks and reprogrammed settings. Additional costs were $1,200.00 for labor and parts. 5/21/2024 7/22/2024 $100.00 $1,300.00 SP
43085 Frank’s Repair Plumbing Purchase Order Internal Repair – Initial PO amount of $289.00 to diagnose issue at the Trading Post, Property #895756, Palo Duro Canyon State Park. Vendor determined that sewer line was broken and required replacement, as well as replacement of residential toilet to commercial toilet. Water line required upgrading as well. Additional costs were $1,701.00 for labor and $4,624.00 for parts. 7/1/2024 7/23/2024 $289.00 $6,614.00 SP
42986 Wallace Controls & Electric Purchase Order Internal Repair – Initial PO amount of $100.00 to diagnose issues with Juniper Ridge lift station at Meridian State Park. Vendor determined that replacement of two effluent pumps and associated parts was required. Additional cost was $9,792.00 for labor and parts. 6/26/2024 7/10/2024 $100.00 $9,892.00 SP
40337 Atlas Copco Compressors, LLC Purchase Order Internal Repair – Initial PO amount of $1,500.00 to diagnose issues with compressor on ozone generator, Property #195500, Possum Kingdom Fish Hatchery. Vendor had to rebuild compressor. Additional costs were $5,035.05 for labor, $58,055.28 for parts, and $436.52 for misc. fees related to parts being shipped to hatchery. 4/15/2024 6/28/2024 $1,500.00 $65,026.85 IF
43539 Frank’s Repair Plumbing Purchase Order Internal Repair – Initial PO amount of $267.00 to diagnose water leak at park entry between HQ and Admin. Building at Palo Duro Canyon State Park. Vendor replaced broken water line and sleeve and added a valve. Additional costs were $3,255.00 for labor and $5,162.00 for parts. 7/16/2024 7/30/2024 $267.00 $8,684.00 SP
43893 Berry Raley’s Custom Fence Purchase Order Internal Repair – Initial PO amount of $650.00 to diagnose issue with entry gate at Mother Neff State Park. Vendor determined that replacement of three pole reversing contactor was required. Additional costs were $100.00 for labor and $200.00 for parts. 8/1/2024 8/12/2024 $650.00 $950.00 SP
42311 Mackie’s Automotive Purchase Order Internal Repair – Initial PO amount of $100.00 to diagnose issue with 2015 Ford van, Property #205934, Caprock Canyon State Park. Vendor determined replacement of throttle body was required. Additional costs were $130.98 for labor and $400.00 for parts. 6/5/2024 7/23/2024 $100.00 $630.98 SP
43463 George P. Bane, Inc. Purchase Order Internal Repair – Initial PO amount of $500.00 to diagnose issues with depowering, ABS, and stop sensors on compact track loader, Property #206480, Old Sabine Bottom WMA. Vendor drained oil, replaced air and fuel filters, flushed out radiator and heat exchanger, refilled crankcase, and replaced cab air filter. Additional costs were $260.00 for labor and $603.15 for parts. 7/12/2024 N/A $500.00 $1,363.15 WL
40077 McNarra Purchase Order Internal Repair – Initial PO amount of $690.00 to diagnose plumbing issue at campground bathrooms, Property #895602, Ft. Parker State Park. Vendor had to excavate existing sewer line, demolish existing manhole, add cleanouts, and replace approximately 60 ft. of sewer line. Additional costs were $13,875.00 for labor and parts. 3/21/2024 7/9/2024 $690.00 $14,565.00 SP
41525 Carl J. Covington Purchase Order Internal Repair – Initial PO amount of $500.00 to diagnose issues with HVAC at 3 bedroom house at Elephant Mountain WMA. Vendor determined that total HVAC replacement was required. Additional costs were $1,395.00 for labor and $7,625.00 for parts. 5/17/2024 N/A $500.00 $9,520.00 WL
42120 Carl J. Covington Purchase Order Internal Repair – Initial PO amount of $500.00 to diagnose issue with air compressor (no property number assigned) at Elephant Mountain WMA. Vendor determined that air compressor was not repairable, and replacement was required. Additional costs were $75.00 for labor and $3,825.00 for parts. 7/15/2024 N/A $500.00 $4,400.00 WL
43957 Skinner’s Drilling & Well Service Purchase Order Internal Repair – Initial PO amount of $500.00 to diagnose lack of water flow at Black Gap WMA HQ building. Vendor determined that replacement of pressure tank and control box were required. Additional costs were $2,037.50 for labor and $10,050.36 for parts. 8/29/2024 N/A $500.00 $12,587.86 WL
41559 Arrowhead Well & Service Purchase Order Internal Repair – Initial PO amount of $1,000.00 to diagnose well/control box issues at Elephant Mountain WMA. Vendor determined various pipe replacements were required. Additional costs were $700.00 for labor and $2,429.00 for parts. 6/21/2024 N/A $1,000.00 $4,129.00 WL
42116 Smart’s Truck & Trailer Equipment Purchase Order Internal Repair – Initial PO amount of $200.00 to diagnose issues with brakes and electrical system on gooseneck trailer, Property #180806, JD Murphree WMA. Vendor determined all wiring, brake system, and reflectors required replacement. Additional costs were $2,425.00 for labor and $6,001.82 for parts. 7/16/2024 N/A $200.00 $8,626.82 IF
44482 Dana Ladon Busby dba Busby’s Plumbing Service Purchase Order Internal Repair – Initial PO amount of $100.00 to diagnose cause of water leak at the group barracks, Ft. Parker State Park. Vendor excavated to find and repair water leak. Additional cost was $1,009.00 for parts and labor. 8/15/2024 8/16/2024 $100.00 $1,109.00 SP
CA-6504 Chesapeake Boats, LLC Contract Initial contract amount of $571,000.00 for design/manufacture of research vessel for Coastal Fisheries. $39,554.00 in additions and upgrades were added to initial design/build. 6/25/2024 N/A $571.000.00 $610,554.00 CF
41672 Bryan Hoot Purchase Order Internal Repair – Initial PO amount of $4,000.00 to diagnose issue with water leaks under Inland Fisheries Lab in San Marcos. Vendor had to excavate to locate and repair multiple water leaks, dry out underside of building, and replace pipes. Additional cost was $11,456.00 for parts and labor. 6/14/2024 8/31/2024 $4,000.00 $15,456.00 SP
44011 CNT Customs, LLC Purchase Order Internal Repair – Initial PO amount of $468.00 to diagnose issues with 2017 Airboat, Property #212699, Rockport Maintenance Shop. Vendor determined new starter, fuel pump, and wiring harness were required. Additional costs were $357.00 for labor and $1,378.59 for parts. 4/19/2024 6/19/2024 $468.00 $2,203.59 WL

Internal Repair Purchases

An internal repair is a repair to state-owned equipment that cannot be reasonably defined prior to the actual repair and the extent of the repair needed cannot be determined until the equipment is disassembled. Internal repairs are usually the result of an unexpected, basic service outage. For example, the unexpected failure of a building’s air conditioner may result in unanticipated repair to electrical circuitry, which would constitute an internal repair. Internal repairs must include labor and may include parts.

Competitive award is not required for an internal repair.  However, internal repairs are reported on the Electronic State Business Daily (ESBD), LBB website, and other transparency reports as required by state purchasing policies and procedures.

Internal Repair Procedures:

To limit agency liability, the following statement is added to the Purchase Order as a note to the supplier:
“Not to exceed {insert reasonable dollar limit} for repair services unless prior authorization is provided by the agency.”
After the equipment is taken apart and the issue identified, the vendor provides a quote to TPWD for review and approval.  If approved, the purchaser issues a contract amendment to formally approve the additional services and cost.

Emergency Purchases

Emergencies occur as the result of unforeseeable circumstances and may require an immediate response to avert an actual or potential public threat. If a situation arises in which compliance with normal procurement practices is impractical or contrary to the public interest, an emergency purchase may be warranted to prevent a hazard to life, health, safety, welfare, property or to avoid undue additional cost to the state.

Emergency Contract Awards are reported on the ESBD, LBB website, and other transparency reports as required by state purchasing policies and procedures.

In official recognition of the adoption of this resolution in a lawfully called public meeting of the Texas Parks and Wildlife Commission, we hereby affix our signatures this 7th day of November, 2024.

Jeffery D. Hildebrand, Chairman

Oliver J. Bell, Vice-Chairman

James E. Abell, Member

Oliver J. Bell, Member

Wm. Leslie Doggett, Member

Paul L. Foster, Member

Anna B. Galo, Member

Robert L. “Bobby” Patton, Jr., Member

Travis B. “Blake” Rowling, Member

Dick Scott, Member